Here’s a short video of the rammed earth process – thanks to Jonah. The earth comes right from the site, we sieve it and then mix it with 5% cement and enough water to make sure it packs well. It’s a bit of shoveling and lifting, but we can build 16 inches height of the 80 foot long wall in a day when we’re clicking. We’re up to 32 inches after two days – so we’re clicking – thanks to good weather and good friends. https://youtu.be/U_wkym8nLMI